You are here » Home» Renewables News» Wind Energy» Industry PR» Company News» Gamesa to supply 49,3 MW to Guangdong Nuclear Group in China

Gamesa to supply 49,3 MW to Guangdong Nuclear Group in China

Font size: Decrease font Enlarge font
image Gamesa operates in China as a turbine manufacturer and wind farm developer

The company has signed 350 MW projects with this utility in the past years.

Beijing, 4 December 2012. Gamesa, a global technology leader in wind energy, has signed a deal to supply 49.3 MW of capacity (58 of its 850 kW wind turbines) to China Guangdong Nuclear Wind Energy Limited for the wind farm located in Shandong Province, in China.

The wind farm is under built and is targeted to connect with the grid at the end of this year.

Gamesa in China and its relationship with Guangdong

The cooperation between Gamesa and Guangdong Nuclear were back to the year of 2009. Since then, Gamesa has signed 350 MW projects with this utility in Shandong, Liaoning and Heilongjiang provinces.  China Guangdong Nuclear has widely used Gamesa 850 kW and Gamesa 2.0 MW wind turbines.

Gamesa operates in China as a turbine manufacturer and wind farm developer, a competitive advantage it strengthens through joint ventures with the country's major power companies (at a global and provincial level), thanks to its comprehensive knowledge of the wind energy industry.

Gamesa has operated in China since 2000, installing more than 3,000 turbines at more than 60 sites across the country. As a wind farm developer, the company's joint development pipeline in China now totals around 3,000 MW.

Gamesa (www.gamesacorp.com/en)

With 18 years’ experience and more than 25,000 MW installed in 40 countries, Gamesa is a global technological leader in the wind industry. Its comprehensive response includes the design, manufacturing, installation and maintenance of wind turbines, that manages for more than 18,000 MW.

Gamesa has production centres throughout Europe, the United States, China, India and Brazil.

Gamesa is also a world leader in the development, construction and sale of wind farms, having installed over 5,000 MW and having a portfolio of 25,000 MW in Europe, America and Asia.

Read Article..

Wind Energy recruiters and job seekers can now register on our industry leading renewables job site. Please click on the logo below to get started.

World of Renewables Jobs

Share/Bookmark

Subscribe to comments feed Comments (0 posted):

total: | displaying:

Post your comment comment

Please enter the code you see in the image:

Member's Area
Translation Tool
Article Tools
  • email Email to a friend
  • print Print version
  • Plain text Plain text
  • Publish my own news Submit an article
  • Register Free Register Free
  • Share/Bookmark
Poll: Wind Energy Mix
Gas, oil and coal are limited resources, whilst the use of wind power constitutes an alternative. Do you believe that the share of wind power in the energy mix is already sufficient?
Article Author
Tags
No tags for this article
Submit Your Press
Click here to
Navigate archive
first first April, 2014 first first
Su Mo Tu We Th Fr Sa
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Poll: US Solar Development
How important do you think it is for the U.S. to develop and use solar power?